RFCs are documents that contain major plans and decisions for the engine
Many changes, including bug fixes and documentation improvements can be implemented and reviewed via the normal GitHub pull request workflow.
Some changes though are 'substantial', and we ask that these be put through a bit of a design process and produce a consensus among the Amethyst community and the [sub-team]s.
The "Request for Comments" (RFC) process is intended to provide a consistent and controlled path for new features to enter the engine and associated libraries, so that all stakeholders can be confident about the direction in which the engine is evolving.
You may join our Discord here and the Amethyst Community Forum here: https://community.amethyst-engine.org.
You need to follow this process if you intend to make "substantial" changes to Amethyst, its component crates, or the RFC process itself. The definition of substantial is somewhat fluid, and to an extent set by the community. Some examples might include:
Some changes do not require an RFC:
If you submit a pull request that ends up being generating a lot of discussion or pushback, you may be asked to submit an RFC. What seems to be a minor change can have unintended consequences other teams might see.
For more details on when an RFC is required for the following areas, please see the Amethyst community's [sub-team] specific guidelines for:
A hastily-proposed RFC can hurt its chances of acceptance. Low quality proposals, proposals for previously-rejected features, or those that don't fit into the near-term roadmap, may be quickly rejected, which can be demotivating for the unprepared contributor. Laying some groundwork ahead of the RFC can make the process smoother.
Although there is no single way to prepare for submitting an RFC, it is generally a good idea to pursue feedback from other project developers beforehand, to ascertain that the RFC may be desirable; having a consistent impact on the project requires concerted effort toward consensus-building.
The most common preparations for writing and submitting an RFC include talking the idea over on the Discord channel, specifically with the applicable sub-team and discussing it on our Amethyst Community Forums
We welcome all ideas and strive to provide kind but useful feedback. While not every proposal will make it through, that should in no way discourage anyone from continuing to make proposals in the future.
If the proposal is promising and someone is new to the RFC process, we will do our best to find someone to mentor them through the process.
In short, to get a major feature added to Amethyst, one must first get the RFC merged into the RFC repository as a markdown file. At that point the RFC is approved and may be implemented with the goal of eventual inclusion into Amethyst.
0000-template.md
to text/0000-my-feature.md
(where "my-feature" is
descriptive. Don't assign an RFC number yet).These are issues created on GitHub that track the implementation progress of the RFC. They link to related issues, have checkboxes, or other structures that make them more of a meta-issue than an issue for adding a specific feature or fixing a bug.
This issue is one the sub-team will create, not one you need to create.
We use the following tags for RFC tracking issues:
See the life-cycle section below for details on what these mean.
When an RFC is first created, a tracking issue is created and given the label "RFC: Proposed".
Once an RFC becomes approved, the tracking issue will be tagged with the label "RFC: Accepted". Authors may implement it and submit the feature as a pull request to the Amethyst repo. Being approved is not a rubber stamp, and in particular still does not mean the feature will ultimately be merged; it does mean that in principle all the major stakeholders have agreed to the feature and are amenable to merging it.
Furthermore, the fact that a given RFC has been accepted and is approved implies nothing about what priority is assigned to its implementation, nor does it imply anything about whether an Amethyst developer has been assigned the task of implementing the feature. While it is not necessary that the author of the RFC also write the implementation, it is by far the most effective way to see an RFC through to completion: authors should not expect that other project developers will take on responsibility for implementing their accepted feature.
Modifications to approved RFCs can be done in follow-up pull requests. In order for a PR that deviates from the RFC standard, a new RFC that follows the accepted guidelines should be written and contain a link to the prior version.
We strive to write each RFC in a manner that it will reflect the final design of the feature; but the nature of the process means that we cannot expect every merged RFC to actually reflect what the end result will be at the time of the next major release.
In general, once accepted, RFCs should not be substantially changed. They should be as detailed as possible so that only very minor changes are needed as amendments. More substantial changes should be new RFCs, with a note added to the original RFC. Exactly what counts as a "very minor change" is up to the sub-team to decide; check Sub-team specific guidelines for more details.
While the RFC pull request is up, the sub-team may schedule meetings with the author and/or relevant stakeholders to discuss the issues in greater detail, and in some cases the topic may be discussed at a sub-team meeting. In either case a summary from the meeting will be posted back to the RFC pull request.
A sub-team makes final decisions about RFCs after the benefits and drawbacks are well understood. These decisions can be made at any time, but the sub-team will regularly issue decisions. When a decision is made, the RFC pull request will either be merged or closed. In either case, if the reasoning is not clear from the discussion in thread, the sub-team will add a comment describing the rationale for the decision. In the case of the RFC being closed, the tag "RFC: Declined" will be added to the tracking issue. If it is merged, it will receive the tag "RFC: Accepted".
Some accepted RFCs represent vital features that need to be implemented right away. Other accepted RFCs can represent features that can wait until some arbitrary developer feels like doing the work. Every accepted RFC has an associated issue tracking its implementation in the Amethyst repository; thus that associated issue can be assigned a priority via the triage process that the team uses for all issues in the Amethyst repository.
The author of an RFC is not obligated to implement it. Of course, the RFC author (like any other developer) is welcome to post an implementation for review after the RFC has been accepted. A prototype or other supporting materials (data flow diagrams, architecture diagrams, aggregations of posts from the community) can all help demonstrate the need and the priority of the RFC.
If you are interested in working on the implementation for an approved RFC, but cannot determine if someone else is already working on it, feel free to ask (e.g. by leaving a comment on the associated issue).
Once an RFC has been implemented, the tracking issue will be closed and given the label "RFC: Complete".
Some RFC pull requests are tagged with the "RFC: Postponed" label when they are closed (as part of the rejection process). An RFC closed with "RFC: Postponed" is marked as such because we want neither to think about evaluating the proposal nor about implementing the described feature until some time in the future, and we believe that we can afford to wait until then to do so. Postponed pull requests may be re-opened when the time is right. We don't have any formal process for that, you should ask members of the relevant sub-team.
Usually an RFC pull request marked as "RFC: Postponed" has already passed an informal first round of evaluation, namely the round of "do we think we would ever possibly consider making this change, as outlined in the RFC pull request, or some semi-obvious variation of it." (When the answer to the latter question is "no", then the appropriate response is to close the RFC, not postpone it.)
The process is intended to be as lightweight as reasonable for the present circumstances. As usual, we are trying to let the process be driven by consensus and community norms, not impose more structure than necessary.
All code in repositories under the amethyst/ organization is Apache 2.0 or MIT licensed while all assets are Creative Commons Attribution 4.0 licensed if not otherwise stated.
Unless you explicitly state otherwise, any contribution intentionally submitted for inclusion in the work by you, as defined in the Apache-2.0 license, shall be dual licensed as above, without any additional terms or conditions.